Everything about the property — in one place.

SHD property platform

Everything about the property — in one place.

Drawings, cables, and property status — always within reach.

SHD property platformSystem status visible to the team
current property statusEverything about the property — in one place.Documents and cables beside the task
automation objects
100+
team roles in a project
04
current property status
24/7
  • One current version of the propertyDocuments and cables beside the task
  • System status visible to the teamOwners and engineers work together

Platform map

Every module has a job

Explore the working surfaces that connect design, delivery, documentation, operations, and service in one project context.

Open the team workspace map
29 team workspace sections

SHD property platform

What the platform covers

Cable journals, drawings, documents, and statuses stay together in one working place.

01

Interactive cable schedule

Instant search for any cable, light fixture, or switch linked to its panel terminal and room.

02

Transparency for all parties

Designers see layouts, electricians see wiring schematics, and owners see progress and documentation.

03

Real-time system monitoring

Real-time automatic tracking of controller availability, panel temperatures, and network gateways.

04

Knowledge base & warranty

All device datasheets, user manuals, and change history are stored in one place permanently.

Who is this for

Find your role in the project

The platform is tailored so every participant sees exactly what they need — without unnecessary complexity.

01

Property Owner · Know everything about your home

Open the project in any browser or on your phone — without chasing engineers.

02

Designer / Architect · Your vision in the system

Coordinate scenes and layouts without scattered PDF versions.

03

Engineer / Contractor · Documentation right on site

Work from your phone inside the panel room or on site

Project flow

One project — one connected chain

Move from the first brief to long-term service without losing decisions, evidence, or context.

01Project Base

Collect property context, participants, decisions, and scope before work spreads across tools.

Example objectProperty · team · scope
ResultOne current project context

Current stage

Workspace questions

How the SHD property workspace works

Short answers about data, roles, and the project team’s result.

Access is assigned by role and project. Each participant sees only the working context needed for their task.

Yes. The cable journal, statuses, linked documents, and changes remain in one project workspace.

A current view of the property, a complete documentation set, and a clear entry point for operation and support.

The project team grants limited access to the required sections and revokes it after the stage is complete.

Or write to us

Let's discuss workspace implementation

Tell us which property you want to bring into the workspace

Before the first meeting, we will outline how to connect the property and what the team will see

Code from the image
Code from the image